ASE-CL02 / Building Performance
ClimateProof Restore
Controls, mechanical corrections and handover sit in one contract scope, with performance acceptance agreed before installation.
Proposed scope · quote and availability subject to review
Technical brief
- Project-selected fan/drive/valve/control interventions
- Design airflow/head/load and control protocol recorded
- Commissioning checklist, point schedule and owner training
- Electrical protection and site interfaces designed by competent engineer
Intended outcome
- Investment tied to diagnosed problem
- Maintainable documented installation
Commercial scope
Exact equipment, delivery responsibility, documentation, acceptance criteria, price and timing are confirmed in the written proposal. No brand affiliation or certification is implied.
Tell us about the requirement.
Include these details in your enquiry:
Existing drawings · Nameplates · Required operating hours · Protocol · Access · Failure history
START THIS ENQUIRY ↗